Plug and Abandonment
End-of-well operations are often more difficult than initial well construction. These plug and abandonment (P&A) operations require maximum efficiency without sacrificing safety—all while limiting impact to the environment.

Halliburton provides the technology and expertise to facilitate safe and efficient operations worldwide for P&A solutions and specialized subsea projects for jacket and subsea tree removal. Our full suite of well abandonment technologies reliably and accurately address a wide range of environments. Integrated and careful planning ensures cost effectiveness, while meeting regulatory and technical requirements.

For more specifications:
http://www.halliburton.com/en-US/ps/wireline-perforating/wireline-and-perforating/cased-hole-services/plug-and-abandonment.page?node-id=hfqelae4