Allied-Horizontal’s Tubing Conveyed Perforating (TCP) completion process enables perforating extremely long intervals in single runs. In challenging applications, such as extended-reach horizontal and high-angle wells, our TCP solutions control cost and minimize NPT. While in unconventional gas plays, our TCP applications can be used with coiled-tubing conveyance for stage-frac applications.
With a multitude of firing systems, gun release systems and accessories, Allied-Horizontal can help design effective perforating applications needed for the completion in all well conditions.
Direct Pressure
Time Delays
Ball Drop
VID (Vertical Interruption Device)