Firefighting and Pressure Control
BLOWOUT & WELL CONTROL RESPONSE
Catastrophic well control incidents occur unexpectedly and necessitate immediate emergency response, regardless of time or day. With the world’s largest and most experienced staff of Well Control Specialists, Wild Well maintains Blowout & Well Control Response teams on standby at all times – 24 hours a day, 7 days a week, 365 days a year – ensuring rapid response to the site of the incident to mitigate uncontrolled fires, well flows, etc., and restore control of the well.

Well capping
Well re-heading
Well-related fire suppression
Deluge systems
PRESSURE CONTROL
Wild Well provides specialist assistance – available in-office and/or on location in the field – to resolve well control complexities to regain hydrostatic control of a given well. In complex wells, the margin between fracture gradient and pore pressure gradient is narrow, which makes formation breakdown always a possibility.

Wild Well possesses the necessary expertise and skills to help clients return to normal operations after encountering well control issues such as:

High-volume kicks
High-pressure kicks
Underground blowouts
Kicks with lost circulation
Kicks with no pipe in the hole
Kicks in oil-based drilling fluids
Kicks with drillstring off bottom
Pressure control in H2S environments
Pressure control in HPHT wells