The time and cost associated with a completion workover can be significant. Halliburton offers an array of intervention solutions including retrievable packers, plugs, and straddle systems specifically designed to keep production online and postpone the need to work over your well.
- Flow Control Equipment
- Packers and Straddles
- Retrievable Bridge Plugs
For more specifications:
http://www.halliburton.com/en-US/ps/completions/well-completions/intervention-solutions/default.page?node-id=hfqel9vz